liftrue supplied HMPE eye-eye slings (WLL 30T) for the RWE Nordseecluster B offshore wind project — one of Europe's largest renewable energy initiatives in the German North Sea.
Project Background
Located in the German North Sea, the Nordseecluster B wind farm deploys next-generation offshore wind turbines. The installation of monopile foundations — each weighing hundreds of tonnes — demanded lifting equipment that combined exceptional strength with corrosion resistance for harsh offshore conditions.
The Solution
liftrue supplied UHMWPE Slings engineered for the project. Key specifications: WLL 30 Tonnes, Safety Factor 6:1, Material 100% High-Modulus Polyethylene (UHMWPE fiber). The non-corrosive properties make them ideal for prolonged service in marine environments. Each sling was individually tested and certified before deployment, with full traceability documentation provided to RWE.